Simple 5 Step Easy Install Artificial Turf Field

- Mar 22, 2018 -

Simple 5 step easy laying artificial turf field


Artificial turf variety, length adjustable, and convenient construction, can be paved in asphalt, cement site.


微信图片_20171109090731.jpg



Paste before the lawn to ensure that the bottom of the clean, dry and non-water, should not be wet and rainy weather and other adverse weather construction, industrial temperature should be 0-40 ℃ between the construction is appropriate, otherwise it will lead to poor bonding phenomenon.


IMG_0969.JPG


Artificial grass paste production and construction of concrete steps are as follows:


First, adhesive bonding:

Requires a brush at the bottom of the grass brushing uniform thickness, can not be repeated coating, or cause foaming, or even drop, and strictly control the thickness of the glue, pay attention to the coating speed should be appropriate, were applied to the two adhesive surface on.

According to the temperature, humidity and other conditions reasonable to control the drying time, the general good glue 10-15 minutes is appropriate, mortar reached 89% dry sticky non-stick is appropriate. Adhesion requires a one-time alignment sticky. Never move the bonded object back and forth after bonding.


Second, the pressure curing:

After the adhesion to remove debris on the surface, with a dedicated rubber hammer hammer from the adhesive to the hammer on both sides of the solid, so that the surface fully bonded dense and more solid. The curing time is generally three days, the final test intensity is generally ten days. Therefore, during curing should pay close attention to its maintenance, to avoid excessive exposure, water invasion and movement, in order to achieve the best bonding.


Third, cutting and rest:

After bonding, the ground cut pieces are cleaned before the quartz sand and rubber grains are not filled.


Fourth, paving quartz sand

Lawn paste good rest, you need to use sand in the grass with special quartz sand grass, so that the grass is not lodging, irrigation to the remaining height of grass seedlings less than 10mm, sprinkled rubber particles in the grass surface, spreading to be uniform, grass Seedlings should not be perforated with angular sand to prevent injury to athletes.


Five, check and acceptance

After more than a few steps, the lawn laying process is basically completed, and finally need to check and accept the lawn as a whole, if any problems should be promptly corrected.


turf supplier.jpg

HAINING JIANGSEN ARTIFICIAL GRASS CO., LTD

Add: ROOM 1503-1504, BUILDING 1, GUANGLONG FORTUNE CERTER, NO. 238 QIANJIANG WEST ROAD, HAIZHOU STREET, HAINING CITY,JIAXING CITY, ZHEJIANG

whatsapp/Tel: +8613696863502

E-mail: contact@js-grass.com

skype: amysun86


Related News

Related Products

  • Stem Shape Artificial Grass Wear Resistance for Synthetic Grass Playing Football Outdoor
  • Good Quality Artificial Turf Fake Carpet Grass Football Outdoor
  • Colorful Backyard Landscape Artificial Grass Synthetic Turf for Decoration
  • 50mm High Artificial Turf for Football Field
  • Popular Economic Flat Shape bright green 35mm Outdoor Artificial Carpet flooring for Garden
  • Artificial Turf for Golf Artificial Grass Golf Course