Artificial turf variety, length adjustable, and the construction is convenient, can be in the asphalt, cement pavement.
Paste the following matters: before the paste to ensure that the seams, lawn and other surface clean, dry and no water, not in the wet, rain and other adverse weather construction, the ambient temperature between 0-40 ℃ construction is appropriate, otherwise Leading to sticky phenomenon is not strong.
Artificial turf paste the specific steps are as follows:
First, adhesive adhesive:
It is necessary to use a brush in the bottom of its lawn thick and uniform, can not be repeated coating, or cause blistering phenomenon, or even fall off, strictly control the thickness of glue, pay attention to the appropriate glue, were applied to the bonding of two bonding on.
According to the then temperature, humidity and other conditions reasonable control of drying time, generally 10-15 minutes to glue is appropriate, mortar to eighty-nine into dry to touch non-stick is appropriate. Bonding requires a one-time alignment. Do not move the bonded object back and forth after bonding.
Second, the pressure curing:
Adhesive after the removal of its surface debris, with a special rubber hammer from the adhesive to both sides of the force hammer, so that the surface of the full adhesion of dense and more solid. The curing time is generally three days, the final strength is generally measured for ten days. Therefore, during curing must pay close attention to its maintenance, to avoid too much sun, water invasion and movement, in order to achieve the best bonding state.
Third, cut the rest:
After the bonding, the debris of the site is cleaned before the quartz sand and the rubber particles are not filled.
Four, paving quartz sand:
Lawn paste after a good break, the need for grass in the use of special quartz sand fixed grass, so that the grass does not lodging, sand to the remaining height of 10 mm below the grass in the grass surface spread rubber particles, spread evenly, grass fiber should not be filled with edges and corners of the sand, to prevent athletes from being hurt.
Fifth, check the acceptance:
After the above steps, the lawn laying process is basically completed, and finally the need for inspection and acceptance of the lawn as a whole, such as the problem should be promptly reported correction.
HAINING JIANGSEN ARTIFICIAL GRASS CO., LTD
Add: ROOM 1503-1504, BUILDING 1, GUANGLONG FORTUNE CERTER, NO. 238 QIANJIANG WEST ROAD, HAIZHOU STREET, HAINING CITY,JIAXING CITY, ZHEJIANG
whatsapp/Tel: +8613696863502
E-mail: contact@js-grass.com
skype: amysun86