Pavement Of Artificial Turf In Football Field

In general, the laying of artificial football fields is generally divided into the following ten steps:


1. Check the entire turf field to be laid, whether the basic compactness and flatness meet the requirements, and then start to spread the artificial turf. In order to make the folds of the lawn naturally stretch, it is recommended to expose the artificial lawn to the sun for the best day.


 2. Before starting the artificial turf, measure the line on the whole site, measure the position of the course line and mark it, mark it with ink of different colors, and determine the laying direction and position of the artificial turf.


3. Start laying artificial turf: a special splicing belt is placed on the turf joint surface and fixed on it with steel nails. The steel nail head cannot be raised, and the joint area needs to be overlapped and overlapd by more than 10 cm.


4. Apply glue to the joint interface. Before the glue dries, cut and join the cut lawn so that each artificial lawn is tightly bonded.


5. After the laying is completed, it is necessary to carefully check whether the bonding of each joint area is smooth, and whether the artificial grass is firmly bonded. After the inspections meet the requirements, the next step can be carried out.


6. Cut off the green artificial turf at the position where the white artificial turf needs to be set, insert the joint belt, apply glue on it, and then insert the cut white artificial turf into the course line marked before the pavement. The position is bonded to the splicing tape.


7. Sprinkle quartz sand and rubber pellets according to the needs of the site. If you need to sprinkle quartz sand, pour quartz sand or black rubber particles into the sprinkler, push the sprinkler to fill the surface of the artificial turf with quartz sand or black rubber particles, and brush the quartz sand or black behind the sprinkler. The rubber particles and the quartz sand or black rubber particles are fully dropped. Push the speed of the sprinkler to be uniform, not too urgent or too slow, to achieve uniform thickness.


8. After the quartz sand or rubber rubber particles are laid, check whether it is level and sufficient. If it is insufficient, it should be added as needed. Any impurities found in the pavement should be removed immediately to ensure the quality.


9. The quartz sand or rubber particles in the paving should be kept dry to facilitate the flow of quartz sand or rubber particles. After the quartz sand or rubber granules are paved, you can also use a hard brush or a light-loaded drag-type heavy brush to make the quartz sand drop fully dense.


10. After the completion of the laying, the inspection will be terminated.


Precautions:


1.Gluing: It is required to use a brush to apply a thick and even coating on the back of the turf. It is not possible to apply glue repeatedly, otherwise blistering may occur or even fall. When applying glue to the base fabric, the thickness of the glue should be strictly controlled. Note that the speed of the glue should be appropriate. When applying the glue, it should be applied to the two bonding surfaces that are bonded.


2.Bonding: According to the actual influence of temperature, humidity, pressure and other conditions at that time, reasonable control of drying time, generally 10-30 minutes after the application of glue, the glue reaches 80% dry and the hand touch is not sticky. It is required to adhere to the one-time alignment when bonding, and it is not allowed to move the bonded object back and forth after bonding.


3. Pressurization: After bonding, remove the surface debris, and use a special rubber hammer to hammer the two sides from the bonding point, so that the surface is fully contacted and dense, and the bonding is firmer.