The inspection, measurement and lofting of the artificial lawn project.
Before the construction of the artificial lawn project, the professional construction units will make detailed measurements and lofting of the site to ensure the construction of the artificial lawn is safe. The whole work is divided into three stages: basic project inspection and acceptance, dimension measurement and artificial lawn.
When checking and accepting the artificial lawn foundation project, it is required to clean up the debris in the foundation. If there is any irregularity, it should be repaired and leveled in time. Secondly, the construction site should be cleaned to ensure the cleanliness and construction quality of the environment. Execute measurement and lofting according to the rules of design drawing.
On the basis of artificial lawn engineering standards, and then use steel tape, measure the surrounding facilities is in line with the size of the playground, if there are any inappropriate places need to make changes, improve the accuracy of all details as possible, improve the quality of artificial lawn construction.
After the above two aspects to the official start of the pavement in the artificial lawn, * first laid non-woven fabric in the direction of the field length, must ensure that its orientation and a 90 - degree orientation of man-made lawn, non-woven adhesive between firm.
Follow the line length of the drawing to